Dirt Town’s auto leveling helps the dozer blade follow a grade you mark with stakes. Start by deciding where the road needs to begin and end, then check the blade mode from the cab before cutting. If the blade takes too much material on the first pass, bring the ground to the target in stages.
Mark the grade you want the blade to follow
Set out the grade stakes along the section you want to shape. Use similar elevations when you are preparing a level strip. For a ramp, make the intended height change clear from one end to the other. Inspect the marked line and its approach before getting into the dozer. A route that starts at the wrong height can leave a bump where it joins the existing ground.
The official Dirt Town Steam listing specifically describes setting sticks and using the dozer to level slopes and curves. Recheck the stakes if the marked surface does not connect where you expected.
Select the mode that follows the stakes
In a recorded November demo run, the operator pressed J in the dozer to cycle the blade modes and selected the mode that followed the grade stakes. Watch the mode readout after each press. The player had to cycle it again to reach the desired setting. Check your own cab binding if you have remapped the controls.
Start at an edge of the marked route where you have room to go straight. Make one short pass and inspect whether the blade is following the expected line. You still steer the machine and choose how to approach the cut.
Make successive cuts and fills
In the player’s recorded dozer grading run, the machine slowed when a large pile built up ahead of the blade. The player used shorter passes and demonstrated raising the blade’s offset before returning to the grade. That is especially useful when the first cut takes too much dirt and the dozer cannot keep moving.
Use the dozer to remove high material and bring enough dirt into low sections to meet the planned surface. Grade control helps hold the target height, but you still need to supply material for a fill and keep the workload manageable on a cut.
Know when to switch back to a manual pass
Move loose piles by hand when you need to bring them onto the line or clear the edge of the route. Then switch back to the stake-following mode for a final pass along the target. If the whole slope is wrong, adjust the stakes before continuing. If just one cut is too deep, a smaller bite or blade offset gives you a way to work toward the same target.
FAQ
Why doesn’t the blade seem to follow the grading line?
Check whether the cab shows the stake-following mode and whether your stakes describe the intended route. Begin with a short test pass to catch a mode or placement issue early.
Do I need to make the full cut in one pass?
Use several passes if a single cut overloads the blade. The demo operator removed excess dirt first and returned to the target once the machine could move through easily.
Does auto leveling place fill where I need it?
You still have to move or bring material to low ground. The mode guides blade height relative to the grade you set.